Hydro (Domination): Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 April 2024

1 January 2024

29 December 2023

28 December 2023

6 September 2023

10 August 2023

12 October 2022

21 July 2022

8 June 2022

5 June 2022

1 June 2022

  • curprev 08:3008:30, 1 June 2022TR4SHQU33N talk contribsm 870 bytes −1 No edit summary
  • curprev 08:2908:29, 1 June 2022TR4SHQU33N talk contribs 871 bytes +871 Created page with "{{Infobox map |map-image = dom_hydro.jpg |file-name = dom_hydro |game-type = Domination |map-environment = Industrial |map-setting = Sunset }} {{Quotation|[http://tf2classic.com/death_and_taxes/day3 Death & Taxes update page]| The four key worksites at Alpha Electric's hydro power plant have been divvied up between the four teams, each with an easy-access control point to call its own. Each team should have an easy time holding its own point, but with the score always so..."